Maschmeyer Concrete is proud to announce the acquisition of the ready-mix and recycled concrete assets of Ready Mix USA in the Atlanta area. This acquisition expands Maschmeyer's operations into Georgia and strengthens its ability to serve customers throughout the Metro Atlanta market!

Location: Tampa, Florida

Award: Lower Carbon Concrete

Project Team

Owner: Tampa Housing Authority

Contractor: Balfour Beatty

Architect: MSA Architects

Engineer: McNamara/Salvia Structural Engineers

Concrete: Maschmeyer Concrete Company

Slag Cement: Argos

Located in Tampa, FL, USA, this multi-family project is currently under construction in the West River neighborhood along the Hillsborough River. The complex will feature an eight-story mid-rise apartment building with 360 units, high-end finishes, and amenities including a pool, fitness center, and clubhouse. The project will also include an eight-level parking garage with 530 parking spaces.

Slag cement was selected for the concrete mixture, to increase its pumpability, workability, and durability as well as provide a low carbon mixture. The mixture provided the contractor with adequate workability and setting times, and it met strength requirements.

Application Type

Application TypeFoundations
% Slag Cement Replacement50%
% Portland Cement
% Portland Limestone Cement50%
% Other SCM (if applicable)
AggregateNo. 57 limestone
Water/cement ratio0.42
7-day strengths5,700 psi
28-day strengths7,710 psi
Application TypeColumns
% Slag Cement Replacement50%
% Portland Cement
% Portland Limestone Cement50%
% Other SCM (if applicable)
AggregateNo. 89 limestone
Water/cement ratio0.42
7-day strengths6,740 psi
28-day strengths9,280 psi
Application TypeShear Walls
% Slag Cement Replacement50%
% Portland Cement
% Portland Limestone Cement50%
% Other SCM (if applicable)
AggregateNo. 89 limestone
Water/cement ratio0.35
7-day strengths8,040 psi
28-day strengths10,350 psi

Source: https://www.slagcement.org/post/manor-west-river